Interlochen Community Art Trail in Grand Traverse Bay area |
Trail construction begins as funding remains uncertain |

For people traveling between Interlochen’s campus and the surrounding community, the promise of a safer route is beginning to take shape.
But Interlochen trail funding remains the question hanging over the larger vision for a continuous community pathway.
The Interlochen Community Art Trail is planned as a three-and-a-half-mile non-motorized connection through this part of Grand Traverse County.
Its proposed route would link parks, schools, campgrounds, neighborhoods, businesses and cultural destinations rather than leave each as an isolated stop.
The first phase has been paved, while a portion of the second phase has also moved into the construction process.
That progress is real, but it does not yet secure a completed trail.
Interlochen Center for the Arts and the Interlochen Downtown Development Authority have committed funding for a segment running from the pedestrian tunnel near campus toward the Little Betsie River.
Getting beyond the river is a separate challenge, with a pedestrian bridge still needing financial support.
That crossing would help carry the route toward the Interlochen Community Center, making it an important piece of the overall connection.
For students, employees and visitors, the appeal is practical: a dedicated path could offer an alternative to walking beside busy roads.
For nearby residents, it could make everyday trips feel less dependent on a car.
Plans also call for attention to accessible ramps and improved crosswalks as the route develops.
Those details matter because a trail is only as useful as its crossings and points of entry.
Additional funding is still needed before the full route can be built, and the bridge remains a particular hurdle.
For now, Interlochen trail construction offers a visible beginning, not a finish line.
The community’s next test is whether that early investment can become a connected route people can use from end to end. |





12 Comments
Join the conversation
Who's paying for the Little Betsie bridge?
Funding for the pedestrian bridge over the Little Betsie River hasn’t been secured yet. The commitments from Interlochen Center for the Arts and the Downtown Development Authority cover a segment leading toward the river, not the crossing.
Dave ThompsonSounds like they’re still looking for funding for the bridge. I hope they share a cost estimate soon.
hope they can fund the Little Betsie bridge
We hope so too. Funding for the Little Betsie River bridge is still needed to carry the trail toward the Interlochen Community Center.
Tom WillisSame here. Without that crossing, it sounds like the trail stops short of the community center.
glad the first stretch is paved
It’s encouraging to see the first phase paved. There’s still work ahead to connect the full route.
Maria G.I walked it last weekend. Nice to have a spot away from the road, even if it's still short.
Glad the first phase is paved!
We’re glad to see that progress, too. The paved first phase is a start, though more funding is needed to complete the route.
Maria G.Me too. It’s nice to see a stretch people can actually use already.